This project adopts a brand-new all-plastic structural design, and the overall sealing is implemented with a glue-applied structure. Subsequently, optical performance requirements are verified through optical simulation analysis, and fogging issues are validated via hygrothermal analysis. If the verification is successful in this project, independent R&D will be relatively challenging.

This project adopts a brand-new all-plastic structural design, and the overall sealing is implemented with a glue-applied structure. Subsequently, optical performance requirements are verified through optical simulation analysis, and fogging issues are validated via hygrothermal analysis. If the verification is successful in this project, independent R&D will be relatively challenging.
| Product Name | Dimension:(L × W × H) mm | Rated Voltage | Power |
|---|---|---|---|
| Headlamp |
820×300×370 |
110V |
45W |
| Environmental Temperature | Color Temperature |
Luminous Intensity |
Ingress Protection (IP) Rating |
| -35℃~40℃ |
600K±500K |
200000cd | IP66 |
| Fire Protection Standards | |||
|
EN45545-2:2013 |
|||